v1.14.0 — add Step 3b review workflow, unify file naming, resilient code references

- Add /plan2code-3b-review: 5-step post-implementation review with adaptive
  scope, 11 dimensions, reference-file architecture, and Plan/Apply/Verify fixes
- Unify workflow/skill file naming to single-dash (drop -- and --- conventions)
- Add Devin platform support and CLAUDE.md MANDATORY FIRST STEP template
- Guide agents to use semantic anchors over line numbers in workflow prompts
- Bump version to 1.14.0
This commit is contained in:
jparkerweb committed 2026-05-23 06:58:20 -07:00
1 parent 8e0b1a2ab2
commit 5e48e98293
42 files changed
+3431 -2542

No files matched your search

+3 -2
View File
@@ -68,7 +68,7 @@ Use only when ALL phases in overview.md are marked complete.
## Scratchpad Management
After completing each task, add a new entry at the **bottom** of \`{{specPath}}/.plan2code-loop/scratchpad.md\`.
Never edit, reorganize, or insert into existing content � only append new entries to the end of the file.
Never edit, reorganize, or insert into existing content — only append new entries to the end of the file.
Each entry should include:
- Task completed and Phase item reference
@@ -94,6 +94,7 @@ export const LOOP_PROMPT_TEMPLATE_PHASE = `# PLAN2CODE-LOOP: Autonomous Phase Im
**IMPLEMENT ALL REMAINING TASKS IN THE CURRENT PHASE.**
Find the first incomplete phase, then implement every remaining task in that phase before stopping.
Complete each task fully before moving to the next task within the phase.
## Project Information
- **Project Root:** \`{{projectRoot}}\`
- **Spec Location:** \`{{specPath}}\`
@@ -178,7 +179,7 @@ After ALL tasks in the phase are complete (or blocked), output:
## Scratchpad Management
After completing each task, add a new entry at the **bottom** of \`{{specPath}}/.plan2code-loop/scratchpad.md\`.
Never edit, reorganize, or insert into existing content � only append new entries to the end of the file.
Never edit, reorganize, or insert into existing content — only append new entries to the end of the file.
Each entry should include:
- Task completed and Phase item reference