@@ -90,7 +90,7 @@ Deliver it as a multi-select (`multi` on the web console) of 3–5 features a re
> "What made this come up now? A deadline, an incident, an audit, a customer?"
*Fishing for:* constraints that will shape half the questions and that nobody volunteers unprompted. A regulatory deadline changes the delivery question, the testing posture question, and the out-of-scope line all at once.
*Fishing for:* constraints that will shape half the questions and that nobody volunteers unprompted. A regulatory deadline changes the delivery question and the out-of-scope line all at once.
**The probe names above are internal labels, not headings the human reads.** Head each Q block plainly — *What you end up with*, *Who uses it*, *Leave for later*, *Smallest version that counts*, *How you know it's done*, *Why now* — and keep the probe text itself as plain as the quotes above. "The sacrificial boundary" and "the arrival signal" mean something to this playbook and nothing to the person answering. Full rule in the grilling playbook, *Say it in plain English*.
@@ -275,7 +275,7 @@ Say it out loud so the human tracks the move, then jump:
Two mechanics keep the fan-out honest:
1. **Round-robin the areas.** Before you start, list the axes you intend to cross — engineering axes (data, surface, permissions, volume, delivery, failure, operations, testing) AND product axes (user value, success measurement, target user, rollout, analytics, support & docs, legal/compliance). Not every axis applies to every destination: name the ones that do before the first probe, say which you are skipping and why, then take one probe per axis before any second probe on any axis.
1. **Round-robin the areas.** Before you start, list the axes you intend to cross — engineering axes (data, surface, permissions, volume, delivery, failure, operations) AND product axes (user value, success measurement, target user, rollout, analytics, support & docs, legal/compliance). Not every axis applies to every destination: name the ones that do before the first probe, say which you are skipping and why, then take one probe per axis before any second probe on any axis.
2. **Ask for the axis you have not touched.** Near the end: "What have I not asked about that would embarrass us to discover in week three?"
**Breadth-first is the ideal batch.** One probe per axis means the probes are independent by construction — that is what breadth-first *means* — so this grill should run as batches of three, not as a stream of singles. If you catch yourself wanting to batch two probes on the same axis, that is depth wearing a batch's clothes; pull back.
@@ -294,7 +294,6 @@ Each opens a different axis. Batch three at a time in list order (skipping axes
4. **Volume and time** — "If an export takes four minutes, is that fine, bad, or a redesign?"
5. **Delivery and failure** — "The export succeeds but the download link expires before they click it. What should have happened?"
6. **Operations** — "Six months from now someone asks who exported what. Does this feature audit itself?"
7. **Testing** — "What would you need to see pass before you would let this near a customer's compliance data?" *(This one always runs — see the mandatory testing-posture question below.)*
The product axes, same style — one sample probe each:
@@ -382,7 +381,6 @@ A worked ordering for the audit-log export map:
| `01` | Export format | `grill · HITL` | none | Nothing gates it; it gates the artifact shape |
| `02` | Row-count ceiling | `research · AFK` | none | A fact about the data, independent of every preference |
| `03` | Export authorization | `grill · HITL` | none | Independent axis; can be argued today |
| `04` | Testing posture | `grill · HITL` | none | Mandatory; independent of everything else |
| `05` | Delivery channel | `grill · HITL` | `02` | Synchronous download versus queued link turns entirely on volume |
| `06` | SIEM push connector | `grill · HITL` | none | Created, then immediately ruled out of scope during charting — `State: out-of-scope`, no `## Answer` |
@@ -473,7 +471,6 @@ plan, not at shipped code. Continuous streaming to external systems is not on th
- [x] [Export format](./questions/01-export-format.md) — CSV with a UTF-8 BOM and RFC 4180 quoting, plus a sidecar SHA-256 manifest; JSONL rejected because recipients open these in Excel. *(2026-08-03)*
- [/] [Row-count ceiling](./questions/02-row-count-ceiling.md)
- [ ] [Export authorization](./questions/03-export-authorization.md)
- [ ] [Testing posture](./questions/04-testing-posture.md)
- [!] [Delivery channel](./questions/05-delivery-channel.md) — Blocked by 02
- [-] [SIEM push connector](./questions/06-siem-push-connector.md) — out of scope, see below
@@ -631,61 +628,3 @@ Do this, in order:
4. **Stop.** Do not chart anyway "just in case", do not create questions, do not start planning in this session.
Be honest about the trigger. If two areas are genuinely unformed, that is fog and the map earns its keep. The off-ramp is for the case where you fanned out across every axis and kept landing on solid ground.
---
## Step 6: The mandatory testing-posture question
**Every map includes a `grill · HITL` question on testing posture.** No exceptions, including maps where testing feels obvious.
The reason is mechanical: `/plan2code-1-plan` Phase 1 asks for three things — testing types, whether tests run after each implementation phase, and a coverage target — and `/plan2code-2-document` **string-matches** that answer, either appending a testing block to every phase, creating a dedicated final testing phase, or omitting testing entirely. A map that clears without this answer hands the human a planning session that stalls on its first question. Ask it while there is still someone in the room.
Record the answer in the literals downstream matches on, not in paraphrase. ("Phase" here names `/plan2code-1-plan`'s implementation phases and is a downstream contract string — it is never a pathfinder unit of work.)
It is almost never blocked. Give it whatever number the dependency ordering leaves free, and expect it to sit on the frontier from day one.
```markdown
> Pathfinder planning note - decisions, not implementation work. Archive with the spec; do not delete.
# Testing posture
Type: grill · HITL
State: open
Blocked by: none
Claimed: none
Resolved: none
Locked: no
## Question
What testing does this work carry, so `/plan2code-1-plan` Phase 1 can be answered without
stalling? Three parts, all needed:
- **Types** — unit, integration, end-to-end, some combination, or none.
- **Phase testing** — record one of the two literals `/plan2code-2-document` matches:
`Run after each phase` (a testing block closes every implementation phase) or
`Dedicated phase only` (one final testing phase).
- **Coverage target** — record one of Phase 1's three literals: `Critical paths`,
`Moderate (~60-80%)`, or `Comprehensive (>80%)`.
Recommended answer to react to: unit plus integration; `Run after each phase`;
`Critical paths`. Rationale — this touches compliance data, so the correctness of the
CSV writer and the authorization predicate must be pinned by tests, but the admin UI is thin
enough that end-to-end coverage would cost more than it catches.
Two specific cases worth naming in the answer regardless of the general posture, because
Codebase context shows both are easy to get wrong here:
- The UTF-8 BOM survives Excel round-tripping for non-ASCII actor names.
- The tenant-scope predicate actually excludes other tenants' events, asserted against seeded
cross-tenant data rather than a mock.
Note for whoever resolves this: the coverage target is a number the human owns. Do not infer
it from the codebase's current coverage, and do not soften it to whatever the repo already
achieves.
## Evidence
- `AGENTS.md` records Vitest as the runner with fixtures colocated under `test/`.
- Codebase context: no end-to-end harness exists today; adding one is a real cost, not a flag.
```